Project Scope
In this case, Broadwater Industries was hired to upgrade the existing Alliford Bay asphalt barge ramp servicing the MV “Kwuna.” We facilitated a vertical realignment consisting of the supply and installation of pre-cast concrete panels in the tidal zone and cast in place concrete for the approach above. The Skidegate ramp required concrete spall repairs and the installation of rock-filled gabions to eliminate undermining erosion caused by the ferry propeller wash. All work was completed while maintaining ferry and public access at all times.