Project Scope
Necessitated construction of a new ship stern tie-up dolphin at the Prince Rupert facility. Consisted of two 36-inch diameter steel piles socketed into bedrock and steel batter piles with Dywidag rock anchors, as well as new steel catwalks and tie-ins to existing structures.