Project Scope
New concrete floats were constructed and installed, and eight 24-inch-diameter steel mooring piles were installed. The existing timber approach trestle was repaired, and a newly fabricated 80-foot long aluminum ramp was installed. A 120-foot-long steel pipe breakwater was constructed and installed, complete with concrete anchor and chain mooring system.