Project Scope
Here, Broadwater Industries completed the site prep and installation of concrete foundations and pedestals for the process piping stands carrying the product from the land-based storage tanks out to the wharf where it is transferred into ships. Work included the excavation and installation of 2 concrete piers more than 20 feet deep for the pipe bridge crossing, requiring DYWIDAG-SYSTEMS INTERNATIONAL rock anchors.