Prince Rupert Butze Terminal Facility

  • Date: November 2013 – February 2014
  • Location: Prince Rupert, BC
  • Category:Prince Rupert Butze Terminal Facility, Field Service
  • Owner: Amix Group

Project Scope

Work consisted of the installation of a reinforced concrete abutment along the existing foreshore capable of supporting the future installation of a 30m-long ramp with a 250-ton rating. Installation of pile dolphin framing and shore pipe struts supporting the barge mooring system. All structures were pre-fabricated in our yard facility and field installed in modules.